Quick answer: One 6-head embroidery machine running a typical 7,000-stitch design produces roughly 180-220 pieces per 8-hour shift, including hooping. Heads multiply throughput, not speed - every head sews the same design simultaneously. Enter your equipment below for exact capacity.
A little context
Make the next step easier
Answer the planning question every embroidery shop asks: how many pieces can we produce per shift, and how many days does this order need? Enter the job and your equipment; the calculator handles the head math.
Simple workflow
How it works
Enter the design stitch count and order quantity.
Enter machines, heads per machine, speed and shift efficiency.
Read pieces per shift, total production hours, and runs required.
Questions, answered
Frequently asked questions
How many pieces per day can one 6-head machine produce?+
At a 7,000-stitch design and realistic speeds, one 6-head machine produces roughly 180–220 pieces per 8-hour shift, including hooping. Smaller designs push that well past 300.
Do more heads make each piece sew faster?+
No — every head sews the same design simultaneously, so heads multiply throughput, not speed. A 6-head machine sews 6 pieces in the time a single-head sews 1.